Best Place
to Grow™

The Standard

The Employee Growth Standard

One reference framework for what a growth environment actually is: eight pillars, 73 indicators, four sources of truth and eight hard gates that cannot be averaged away.

8
Pillars
73
Indicators
4
Sources of truth
8
Hard gates

Document

Published

Employee Growth Standard - Version 1.0

Version
v1.0
Status
Public pre-pilot release
Publication date
2026
Effective from
First certification cycle
Next review
After the first completed pilot cycle

Published framework - methodology under finalisation before pilot assessments.

Download the Standard (PDF)

Public pre-pilot PDF edition, 38 pages. Includes the 73-indicator register and detailed requirements. Final scoring rules follow in the Methodology Handbook.

The Employee Growth Standard is a private, independent reference framework published by Best Place to Grow™. It is not an ISO standard, not a government standard and not a legally recognised certification. Any future accreditation will be published here with its issuing body.

Changelog

  • v1.02026Current

    Initial publication: 8 pillars, 73 indicators, 4 sources of truth, 8 hard gates, Sustainable Growth as a binary gate and the fixed alumni redistribution rule.

  • v1.1PlannedPlanned

    First calibration release. Thresholds, indicator discrimination and weightings reviewed against pilot assessment data.

The version in force when an assessment opens governs that assessment to its end.

Four sources of truth

No single source can describe a growth environment.

40%

Employee Experience

Perception

Anonymous employee survey run by BPTG, never administered or filtered by the organization.

30%

Evidence

Proof

Documented policies, systems and artefacts verified criterion by criterion in the Evidence Room™.

20%

Outcomes

Results

Hard organizational data: internal mobility, internal hiring, promotion, reskilling, skill application.

10%

Alumni

Perspective

People who already left. The only source that can tell whether the growth held its value afterwards.

The referential

Eight pillars, 73 indicators

Each indicator has a permanent code in Standard v1.0. Open a pillar to read the full register; detailed requirements and evidence are in the PDF above.

  1. LS01Access to Learning
  2. LS02Protected Learning Time
  3. LS03Learning by Doing
  4. LS04Skill Acquisition
  5. LS05Recognized Learning
  6. LS06Knowledge Sharing
  7. LS07Individual Learning Agency
  8. LS08Future Skills
  9. LS09Reskilling
  10. LS10Learning Effectiveness
  11. LS11Skills Gap Diagnosis
  12. LS12Learning Transfer & Application Support

Indicator architecture

Every indicator is specified the same way

Every one of the 73 indicators follows the same specification structure in Standard v1.0. The examples below give a quick view; the PDF contains the complete requirements and evidence expectations. Final numerical scoring rules remain in progress for the Methodology Handbook.

Standard v1.0 contains the canonical 73-indicator register and detailed indicator requirements, evidence examples and provisional scoring principles. The three examples below illustrate the format; final numerical scoring mechanics will be published in the Methodology Handbook before any real certification.

FieldWhat it fixes
NameThe short label used everywhere, identically.
DefinitionWhat the indicator means, in one sentence, without jargon.
What it measuresThe condition being observed - not the intention behind it.
Evidence examplesThe artefacts that can substantiate it: policies, system exports, measured outcomes.
SourcesWhich of the four sources of truth contribute to it, and in what role.
Scoring approachHow the observation becomes a 0-100 contribution to its pillar.
ExceptionsWhen the indicator does not apply, and how the weight is redistributed rather than penalised.

Worked examples

CM01Career & Mobility

Internal Mobility

Definition
The organization shall enable and measure movement between roles, teams, locations or job families inside the certified scope.
What it measures
Whether mobility actually happens.
Evidence examples
  • HRIS role-change export; mobility policy
  • Rate by population; destination role data
  • Employee survey
Sources
Outcomes, Evidence, Employee Experience.
Scoring approach
Future scoring will combine the verified outcome rate, population coverage and trend, with controls for organization size and relevant context. Activity volume alone is insufficient.
Exceptions
N/A is allowed only where the organization can demonstrate structural non-applicability. Lack of data or lack of process is not an N/A condition.
GL02Growth Leadership™

Managers Assessed on People Growth

Definition
The organization shall include people growth as a formal and consequential part of manager assessment.
What it measures
Whether developing others carries real consequence for managers.
Evidence examples
  • Performance framework; criterion weight
  • Completed reviews
  • Promotion/bonus rules
Sources
Evidence, Outcomes, Employee Experience.
Scoring approach
Future scoring will assess design quality, implementation quality, employee experience and observable consequence. A policy that exists but does not change practice scores materially lower.
Exceptions
N/A is allowed only where the organization can demonstrate structural non-applicability. Lack of data or lack of process is not an N/A condition.
EF06Employability & Future

Skill Application Six Months After Training

Definition
The organization shall measure whether trained skills are still being applied at a meaningful horizon after learning.
What it measures
Whether learning produces durable use rather than short-term recall.
Evidence examples
  • Six-month follow-up
  • Project evidence; manager/peer validation
  • Application metrics
Sources
Outcomes, Employee Experience, Evidence.
Scoring approach
Future scoring will combine the verified outcome rate, population coverage and trend, with controls for organization size and relevant context. Activity volume alone is insufficient.
Exceptions
Where no follow-up mechanism exists, the indicator is scored negatively rather than excluded: the absence of measurement is itself the finding.

Grow Score™

A score that can be refused

The Grow Score™ aggregates the eight pillars across the four sources of truth on a 0–100 scale. It is a summary, never a verdict on its own: certification requires every hard gate to pass independently.

A good average must never compensate for the failure of a hard gate. Every gate is binary and independently assessed.

Sustainable Growth

Growth obtained by consuming people's health, personal life or long-term capacity is not growth. Sustainable Growth is assessed separately and is a binary gate: organizations that grow people at their own expense cannot be certified.

Eight hard gates

Hard gateRequirement
Overall Grow Score™≥ 70
Employee Experience≥ 60
Growth Leadership™≥ 55
Inclusive Growth≥ 55
Survey IntegrityPASS
Evidence IntegrityPASS
Sustainable GrowthPASS
Critical populationsNone below methodology threshold

STRATEX CONSULTING scored 72 overall - above the threshold - and was refused because 4 gates failed: Growth Leadership™, Inclusive Growth, Sustainable Growth, Critical populations. The case is an illustrative methodological demonstration, not a real assessment.